In the year April 2006, The Captive Power
Division (CPD) has been carved out of Power
Project Division to address the Captive Power
Market up to 100 MW capacity. Today CPD can
address the power need of various industries like Steel,
Cement, Textiles, Paper, Pharma, Refinery,
Chemical, Petrochemical, Metallurgical etc. for
their captive power plants. CPD can build Coal
Based Power Plants, Combined Cycle Power Plants,
Biomass Power Plants etc. We are currently executing a 92.2 MW Combined Cycle Power Plant at Valuthur, Ramanathapuram, Tamil Nadu for Tamil Nadu Electricity Board on an EPC Contract basis slated for commissioning by March 2008. The salient features of this project are:
- 64 MW (V64.3A) Gas Turbine and Generator
- 30 MW Steam Turbine and Generator
- Triple pressure Heat Recovery Steam Generator
- Reciprocating Gas Booster Compressor
- Air Cooled Condenser
- Radiator Cooler
- Water Treatment Plant including RO Plant
- 110 kV Sub Station
- Gas Conditioning Skid

In March 2007, The Vedanta
Group has awarded a Turnkey EPC contract for 1 × 25
MW Coal based Thermal Power Plant for their Alumina
Expansion Project at The Madras Aluminum Company
Limited, Mettur Dam. This project is conceived with
a Pulverised Fuel Coal Fired Boiler and an Extraction cum
Condensing Turbine. The major equipment is sourced
from reputed Chinese manufacturers.

The above picture is the
existing power plant at MALCO. BGR will be adding
the new 25 MW power plant adjacent to this. For further queries, please contact: BGR Energy Systems Limited CAPTIVE POWER DIVISION 443, Anna Salai, Teynampet Chennai – 600 018, India Tel: +91 44 24334826 – 27 Fax: +91 44 2436 0578 E-mail: cpd@bgrenergy.com/suresh@bgrenergy.com
|